This document presents the test results for Band 5 of a device undergoing FCC certification, as detailed in report AiTSZ-250313053FW5. The report focuses on power, Effective Radiated Power (ERP), and emissions testing across various configurations. The tests were conducted using both Quadrature Phase Shift Keying (QPSK) and 16-Quadrature Amplitude Modulation (16QAM) schemes, with varying bandwidths (1.4MHz, 3MHz, 5MHz, and 10MHz) and resource block allocations.
The report includes spectrum analyzer plots illustrating the conducted spurious emissions and band edge compliance. The data presented includes measurements of power levels, frequency deviations, and compliance with FCC limits. The results are summarized in Form731, providing a concise overview of the device's performance. The report aims to demonstrate the device's adherence to FCC regulations for radio frequency emissions, ensuring its suitability for operation within the specified frequency bands.
The tests were performed under controlled conditions, and the data presented is intended to provide a comprehensive assessment of the device's radio frequency characteristics. The report serves as evidence of the device's compliance with FCC regulations, supporting its application for certification and subsequent market release.